Skip to content
Yuhox Works · In development

Yuhox Works.

Industry-agnostic project management. Dispatch, work, acceptance, and settlement in one flow.

Contact us
0Start here

How to start

01

Match the workflow first

What is still in development we will not describe as ready. Tell us what you need to do; we will say whether we cover it now.

02

Trial or a pilot

If a pilot fits, we install it. If it does not, we say so — we do not force a sale.

03

Buy after it ships

Prices are on the pricing page. We will not put a placeholder number for something not priced yet.

ⅠOverview

What it solves

Dispatch work, do the work, acceptance, settlement — one job tracked from start to finish. Any industry that assigns work by project, works by work order and gets paid on acceptance runs this process. Yuhox Works drove the industry assumptions out of the core tables; the main process keeps only project, stage, work order, acceptance and settlement. Switching industries means switching templates, not switching systems.

Yuhox Works
ⅡBefore / after

Before and now

BeforeNow
Generic tables stuffed with industry-specific data; a new industry means a rewriteGeneric tables keep only what all business types share; industry differences go through configuration and templates
The workflow is hardcoded to four stages of one industryStages are configurable. Once one industry is working, save it as a template and reuse it for the next
Tickets go out; what comes back is a few photos in WeChatMobile: take jobs, fill in, photograph, and sign. Files bind to the work order.
Settlement is done in Excel; change one cell and the whole sheet recalculatesSettle by project, batch or person; export and book it
No signal on site means you cannot fill anything inCan be filled offline; syncs when back online
ⅢCapabilities

Core capabilities

  1. 01

    Industry-agnostic core

    Five tables — project, stage, work order, acceptance, settlement — carry the main process; industry differences go through configuration.

  2. 02

    Field work

    Ticket dispatch, mobile fill-in, photos and signatures as a trail.

  3. 03

    Settlement and reconciliation

    Settle by project, batch or person; export and book it.

  4. 04

    Template reuse

    Once an industry is proven, save it as a template. The next industry uses it as-is.

ⅣWho

Who it is for

Engineering retrofit, installation and maintenance firms

Assign work to people, keep an acceptance trail, settle by batch

Project teams that use subcontractors

Subcontract tickets and settlement are counted separately; the books stay clear

Teams that have already switched project tools more than once

Do not want to be locked to an industry template again

ⅤWhy this

Why this one

Five tables carry the main flow

Project, phase, work order, acceptance, settlement. The simpler the skeleton, the less a single industry can pull it off course.

Template reuse

Run one industry through once, save it as a template, and the next similar project applies it directly. That's the real payoff of generalizing the design.

Acceptance records are the settlement evidence

Photos, signatures, and measurements bind to the work order. Settlement does not mean digging through chat history for proof.

Same stack as the company's other systems

The front end and the server side use the same technology choices as Yuhox's other sites, so staff can cover for each other. For a small team that's a real cost.

ⅥCompared

Same job, two ways

The left column is what most sites do today, without naming any product; the right column is what this skeleton is meant to be.

TopicCommon practiceYuhox Works
Change industryGeneric tables crammed with industry-specific data; a new industry means a rewriteFive generic tables carry the main process; industry differences go through configuration and templates
Field reportsA few photos in WeChat that never match at settlementTake the job, fill in, photo, sign — on the phone. Files stay bound to the work order
SettlementReconcile in Excel; one change recomputes the whole sheetSettle by project, batch or person; export and book it
No signalCannot fill it in; catch up laterCan be filled offline; syncs when back online
ⅦSpecs

Key parameters

StatusIn development; there's no externally delivered version yet
FormWeb + mobile
Deployment environmentLinux x64 + PostgreSQL
FrontendReact + Vite + TypeScript
AccountConnect to Yuhox unified sign-in
OfflineField work orders can be filled offline
ⅧFAQ

Up front

Can we use it now?

There's no released version yet. This main process genuinely ran on one business line; after that line stopped we stripped out the industry assumptions and kept the skeleton. If you want to use it, contact us first and we'll build the first phase together around your project.

Our industry is very different from senior care. Will this still work?

If the main flow is generic, it can be used. The real test is whether your work fits this line: project — stage — work order — acceptance — settlement. Where it does not, we will say so rather than force it in.

Can we import existing Excel ledgers?

The plan is two-level import: by project, by work order. Which column maps to which field is one click during import.

Do you need on-premises deployment?

The design already supports single-machine deployment; for data-sensitive projects we recommend on-premises, and we provide deployment documentation.

ⅩIdentity

One account, multiple systems

If you use several Yuhox systems, one account covers them all. No separate accounts or passwords per system.

ⅪNext

Walk us through your process

From winning the job to getting paid, who is involved and where it stalls: we walk through it and see whether it fits.

Contact us